Roof Bid Notice: Roof proposal Peshtigo Town Hall  Provide an OSHA approved, site specific safety plan. Remove the existing EPDM roof membrane, any wet substrate insulation and any deteriorated decking - properly dispose of waste at a local authorized landfill.  Replace any wet substrate insulation or rotten decking on a time and material basis with approval from Building and grounds supervisor.  Install a high density, mechanically fastened ½” cover board, roof insulation system, list products being used. Provide manufacturers product information. Mechanically fasten new roofing as recommended per manufacturer’s instructions.    Specify mil thickness to meet warranty requirements.  Mechanically fasten a new minimum 6" x 1/2" treated  plywood strip on all perimeters of the roof to account for the new insulation thickness and to properly support the new sheet metal trim at the perimeter. Remove any obsolete penetrations and properly patch the wood deck in advance of new roofing.  A diagram will be provided. Install matching, adhered, manufacturer approved flashings at all roof top penetrations and projections. All field flashings seams and laps will be properly cleaned, and hot air welded per manufacturer instructions. No tape products or adhesive products are to be used for seam securement.  Provide a shop fabricated perimeter trim drip edge strip from clad metal provided by the roof manufacturer. Color Bronze.  Provide a 24 gauge prefinished steel fascia - color dark bronze, to enclose the new lumber used to support the new roof thickness.  Provide waste hauling, cleaning, toilet service and lifting equipment needed for the duration of the roofing project.  Provide a roof manufacturer's minimum 20 year warranty and what is included in the warranty.  Roof must comply with manufacturer’s instructions and the manufacturer shall provide the parts and labor warranty accordingly. Provide certification for qualifications from contractor. Provide an installer’s minimum 2 year workmanship warranty. Base bid estimate (lump sum) Replacement decking (cost per SF) on a T&M basis ( outside the bid) insulation (cost per square foot) and R value on a T&M basis (outside the bid) T&M Labor (cost per hour) for unforeseen structural issues outside the bid Material markup % outside the bid Lead time (weeks) Estimated project duration (working days) Estimated schedule (rough start date) Planned roof manufacturer Provide Certificate of insurance Provide W-9 or proof of incorporation Provide manufacturing data and warranty with quote Provide manufacturer’s maintenance manual Provide fixed price for 60 days Provide (4) references of this roof installation as completed by your company Bids shall be sealed and opened publicly at the next available board meeting Peshtigo Township reserves the right to accept or reject any bids

TEST TW WEATHER

Community Development Block Grant Feedback

Your feedback is Important 

Town of Peshtigo Citizens are invited to make proposals regarding the application for the Community Development Block Grant Application for the Town of Peshtigo. 
Proposals for the grant can be submitted 3 ways.

  1. Proposals can be emailed to the following:  [email protected]
  2. Proposals can also be dropped off in person with the Town Clerk at the Town Hall during normal business hours.
  3. The online form below can also be used to submit a proposal and or/questions about the application.

Proposals Should Include the Following:
Name:Date of Request:Address:Phone Number:Brief Description of Proposed Activity for the Grant.
Written Response:If suitable proposals are submitted in writing, a written response will be provided within 15 days. Every effort will be made to respond to all proposals prior to the final action on the subject.

Public Hearing:The public hearing is scheduled for November 18th, at 6:00 p.m. at the Town of Peshtigo Hall.
Questions/Concerns:If you have any questions of concerns about the grant application or activities, please do not hesitate to reach out and email [email protected].